Plat Submittals

Fees:

Fees must be paid on plat submittal Monday before 3:00 p.m.

Layering:

Each company must identify their standardized electronic layers (i.e. buildings lines, lots and streets). These layers are extracted and downloaded into the Department’s GIS. Applicants are required to follow their company’s standardized electronic layering. The online Plat Submittal System allows a company to change their layering standard.

Title Reports and Deed Restrictions:

Title reports and, if required, deed restrictions, must be attached to the application, not faxed.

Notes for the Plat Submittal System

ament185 bl 153 bl 154 bl 155 bl 155Z bl 158
bl 158A bl 159A bl 159B bl 159C bl 159D bl 159E
cutback fl 188 ps 231b ps 232b ps 232d ps 232e
sfr def table 183 table 184 table 234 table 236b table 236c
table 236d vis tri